Barton Quarter

Updated: 11 October 2023

Location: Horwich, Lancashire

Developer: Bellway

Number of units: 4 houses


Aim(s) of Project: Achieving the FHS with 200mm cavity masonry & to trial different ASHPs

Construction method: Masonry

Energy Compliance method: SAP 11

Overheating compliance method: TM59


Construction start:  Q3 2022

Construction finish: Q2 2023

North Whiteley picture of house

Overview of Project and Specification

The project involves 4 houses; a pair of semi-detached and two different detached. The construction is masonry using a 200mm cavity. The glazing is expected to be triple glazed (TBC).


Three different monobloc air source heat pumps are being trialled: Ideal Logic, Vaillant aroTHERM and Samsung. PV is on the roof. One house is with MVHR and this will use Posi-Joists to aid ducting. The rest are dMEV.


Embodied Carbon calculations will be conducted to assess the impact of the change in specification.

More information


For more information contact

Jamie Bursnell


Key learnings


  • More learnings will become apparent as the project proceeds (this report will be updated)
  • The main expectations are around issues with the 200mm cavity:
  • Impact on bucket size for diggers
  • Should the cavity be insulated with bead of fibre?
  • Impact of the different heat pump choices.

Performance evaluation


There may be an opportunity for performance evaluation and this report will be reviewed if this occurs.

The numbers