Grid Capacity & Energy Flexibility Working Group
The Future Homes Standard Grid Capacity and Energy Flexibility Implementation Group focuses on tackling the key challenges around the electrification of homes. This includes addressing issues such as After Diversity Maximum Demand (ADMD) calculations, the grid connection process, demand reduction, load shifting, solar PV export, and the potential for micro-grids. Skills and training needs across the sector are also a core part of the discussion.
The group brings together expertise from across the industry to identify barriers, prioritise issues, and track progress against clear actions.
The group is not currently looking for additional members, but specialists in the field are invited to make contact if they feel they have something to offer.
Want to find out more?
Contact Dan Nesham, Head of Sustainability and Performance - daniel@futurehomes.org.uk
Current priorities
This group is focusing on the following areas:
- Accurate Demand Modelling & G81 Standards: Supporting INA and ENA updates to the G81 Low Voltage Design Standard and After-Diversity Maximum Demand (ADMD) calculations to prevent oversizing cables, substations, and connection timelines.
- Microgeneration & PV Export Optimization: Working with industry bodies on voltage level standards to ensure householders fully benefit from solar PV, battery storage, and energy flexibility systems.
- Evidence-Gathering on Constrained Sites: Collating real-world site data from developers to highlight grid connection bottlenecks and inform strategic government interventions.
- Load Mitigation Case Studies: Developing practical guidance on technologies and strategies that reduce peak import and export loads across developments.
- Best-Practice Guidance & Process: Developing home builder guidance to improve early DNO/IDNO engagement and build internal expertise for assessing grid capacity risks at both project and portfolio levels.