The Part L & F 2026 – Transitional arrangements overview
The Building Regulations etc. (Amendment) (England) Regulations 2026 and updated statutory guidance (Approved Document L) come into force on 24 March 2027 for standard new build homes (low to medium rise), while specified provisions for Higher-Risk Building (HRB) work come into force six months later on 24 September 2027.
Standard (Non-HRB) Transitional Arrangements
- Application Deadline: The updated Part L regulations will not apply to building work where a building notice, initial notice, or full plans application for building control approval was submitted to the relevant authority before 24 March 2027.
- Commencement Requirement: To maintain transitional protection under the older regulations, the building work must be commenced on the relevant building before 24 March 2028.
- Applied on an Individual Building Basis: For applications covering multiple buildings on a single site (e.g., a multi-plot housing development), transitional provisions apply by reference to each individual building. Only the specific individual buildings that meet the commencement condition before the 24 March 2028 deadline benefit from transitional protection
Key Differences for Higher-Risk Buildings (HRBs)
- Extended Implementation Timeline: The regulatory changes come into force for HRB work, stages of HRB work, or work to existing HRBs on 24 September 2027.
- Regulator Submission Standard: Transitional protection is granted if a valid building control approval application has been submitted to the regulator before 24 September 2027, provided the application is not rejected before, on, or after that date.
- Protection Across Staged Work: Where transitional protection is triggered by submitting an application for a specific stage of HRB work, that protection automatically carries over to subsequent stages of the HRB work, as long as the original application has not lapsed or been rejected.