What does the change to PV being a Functional Requirement mean
Under previous versions of Part L, solar photovoltaic (PV) systems were included within the Notional Dwelling used for compliance modelling, allowing developers to trade PV systems against other building service specifications or fabric enhancements within the actual dwelling design.
Under the Future Homes Standard 2026 (Part L Requirement L3), as detailed in the Approved Document L: Energy and greenhouse gas emissions (2026) guidance, on-site renewable electricity generation becomes a standalone, non-tradable functional requirement.
Key Implications for Homebuilders and Designers:
- No More Trading Off: Homebuilders can no longer omit or reduce solar PV arrays (below the Functional Target) by over-specifying other building elements or energy-efficiency measures.
- Functional Target: Paet L 2026 details targets a calculation process to define a minimum annual generation targeted based up a standardised PV panel output equivalent to 0.22 kWp/m² across an area equal to 40% of the dwelling’s ground floor area, assuming an unshaded 45-degree pitch oriented south-east to south-west.
- Early roofscape analysis : Roof layouts must be considered early in the design process to calculate the maximum area of PV coverage. If this results in less than the 40% ground floor area relate target, Part L Appendix B – includes edge distance offsets from eaves, ridges, party walls, and roof vents, to be calculate a reduced ‘Max-fit’ PV generation target to be achieved.
- Narrow Exemptions: Exemptions apply only to Higher Risk Buildings (HRBs) over 18 metres in height, where site surroundings make generating reasonable output physically impossible (less than 720 kWh/yr), or where the PV array size to meet the Notional or Max-Fit target would be inappropriately sized for the home and / or available energy infrastructure
Relevant resources
PV – Where to start guide from houses – coming soon
PV – Where to start guide for apartments – coming soon